BEGIN:VCALENDAR
VERSION:2.0
BEGIN:VEVENT
SUMMARY:4620 PLANNED POWER OUTAGE
DESCRIPTION:Dear Resident\,\nOn the evening of Thursday 5/08 beginning at 11pm to Friday morning at 6am\, there will be a planned power outage to complete a major electrical inspection. During this time\, the buildings source of electricity will be transferred from the city power grid to the emergency generator. Additionally\, there will be a period of up to one hour during which the generator will be shut down and the building completely without power.\n \nDuring the entirety of this work\, internal power to all units will be cut\, including the HVAC Systems. While the building is running on emergency generator power\, some lights in the hallways\, lobby\, stairwells\, and garage will continue to be lit\, all elevators will continue to run\, and  the front desk phone and computer will have power. During the hour that the generator is turned off\, the entire building will be dark\, and the elevators stalled. \n \nPlease make sure you are prepared for this power outage by the evening of Thursday the 8th. If you require any special accommodation\, or have any concerns\, please reach out to our General Manager Bill Metzger at generalmanager@4620northparkcondo.com
LOCATION:All floors
DTSTART:20250509T030000Z
DTEND:20250509T100000Z
END:VEVENT
END:VCALENDAR